Permitted
Development
A lot of single storey rear extensions never need a planning application at all. They fall under permitted development, which is a set of national rules that let you build within defined limits without asking.
The limits cover how far you project from the original rear wall, the height at the eaves and the ridge, how close you build to a boundary, the materials you use and how much of the original garden ends up built on. Flats, listed buildings and conservation areas are treated differently, and so are houses that have already been extended, because the rules measure from the original house rather than from how it stands today.
We check this at the first visit. If you are clearly inside the limits we say so. If you are marginal, we recommend a lawful development certificate, which is your council confirming in writing that what you are building is allowed. It costs a fraction of a full application and it is the document your buyer's solicitor will ask for in ten years time.
What We Handle
- Checking permitted development against the original house, not the current one
- Lawful development certificate applications where you are marginal
- Full planning applications where the size or storey count needs one
- Building control notices and booking every inspection
- Party wall notices where you are building near or on a shared boundary
- Structural calculations through an engineer we have worked with for years
Guidance only, not a formal planning opinion. Rules change and every plot is different, which is why we check yours properly rather than guessing from the pavement.
We have had two extensions built by 1989. The second created a very large open plan kitchen in a very old house. Nothing was too much trouble for the team.
What Twelve Weeks
Actually Looks Like
A single storey rear extension, start to finish. Yours will vary, but this is the shape of it and it is what your written programme will be built around.
Set Out And Dig
Marking out, breaking ground, digging the trenches and getting the building inspector out to look at them before anything gets poured.
Foundations And Slab
Concrete in, blockwork up to damp course, drainage run and connected, then the floor slab and insulation.
Walls, Steels And Openings
Brick and block up to plate height, cavity insulated as we go, and the steels in. Where a steel spans the back of the house that opening is formed and propped now, because the roof cannot be loaded until the beam is in.
Roof And Watertight
Roof structure, covering, flashings, fascias and gutters. Windows and doors in. This is the day it stops being a building site and starts being a room.
First Fix
Electrics and plumbing run through the studs, underfloor heating laid if you are having it, then all of it signed off before it is covered over.
Plaster And Second Fix
Boarded, skimmed, floors down, sockets and lights on, radiators hung, then decorating.
Wall Down And Snag
The last of the old wall comes out from under the steel near the end, so you keep living in the house until then. Then we walk it with you, write the list and finish it.
What Our Extension
Customers Say
Ive used the team for several projects over the years and they have been nothing but faultless. Genuinely honest guy who I would recommend to anyone.
Professional, reliable and incredibly hardworking. They always arrived on time, kept everything tidy and communicated with us throughout.
We've had two extensions built by 1989. The second created a very large open plan kitchen in a very old house. Nothing was too much trouble for the team.
From the initial consultation to the final handover, the entire team were professional, transparent and incredibly skilled.
Nice set of people doing the work. Robert did what we agreed and finished on time. We would use them again.
Did a great job repairing work needed to my chimney and walls. Quote was fair and all done on time and to a high standard.
Brilliant group of lads, hard working and quality work. Would absolutely recommend.
Extension Questions Answered
Often not. Most single storey rear extensions on a house fall under permitted development if they stay within the depth and height limits, three metres on a semi or terrace, four on a detached, and single storey at the rear. We check the limits against your plot before we price it, and if it needs an application we say so up front.
A typical single storey rear extension runs eight to twelve weeks from breaking ground to handover. The disruptive part is the first three weeks of groundworks and the week the wall comes out. We give you a written programme so you know which weeks are the bad ones.
That junction is where most extensions fail. We take the flashing up under the existing course rather than sealing over the top of it, and the warm deck is laid so water runs away from the abutment, not into it.
Usually close, rarely exact. Brick from the 1930s has weathered for ninety years and a new one has not. We source the nearest match and where it will look obviously different we suggest a deliberate contrast in cladding instead, which reads as a choice rather than a mistake.
If a public sewer runs through the footprint we need a build over agreement from Severn Trent before we start. If it is a private drain we can usually divert or build over it with the right protection. Either way we find out at survey, not halfway through the dig.
Get Your
Extension Costed
Ring, email or send us photos on WhatsApp. Whatever is easiest. If the team is on site the office picks it up, so you are not left on voicemail.